A general rule of thumb would be to visually inspect every one to two years, secondary injection testing every one to three years, and primary injection every three to five years or on major changes. Testing also needs to be done after installation, setting adjustments, or on any faults. Protection. However, the relay should be vigilant at all times. Settings of various relays need. The testing and verification of relay protection devices can be divided into four groups: Type tests are needed to prove that a protection relay meets the claimed specification and follows all relevant standards. 15 seconds in its 30+ year life. But failure to operate as intended can result in extensive damage, extended power outages, and loss of life. NETA (InterNational Electrical Testing Association) reports show 12% Failure Rates on Protective Relays Tested. Inverse time delay, on the other hand, depends on the current magnitude so, the higher the current, the shorter the delay.